When Does A Building Product Actually Get Specified?
Specification is the point in design when an architect or engineer names an exact product, model, or manufacturer inside the construction documents.
- Public records are checked daily, so a project surfaces as soon as it becomes public, not after it appears on a planholder list.
- Every alert is tagged by CSI MasterFormat division and section, so a manufacturer sees only the projects that match its product category.
- Design-firm and specifier contact details are attached to each project, so outreach goes to the person writing the spec, not a general project inbox.






